AGIBOT G2 brings two-arm manipulation and a humanoid upper body to a wheeled platform. Its strongest reason for inclusion is the connection between named factory work and a recent retail trial. Longcheer has documented the robot inside its Nanchang tablet inspection workflow, while AGIBOT has reported a 24-hour test in a working Shanghai convenience store. Together, these sources give operators concrete environments to compare with their own sites.
01 / THE MODEL
The model and its documented work.
G2 is a wheeled humanoid platform. Its operating assumptions differ from those of walking robots. AGIBOT source ↗
Longcheer documents eight Lingxi G2 units in a tablet testing segment during a June 2026 run. Longcheer Technology source ↗
The Shanghai store trial involved six robots and four passed the final assessment. AGIBOT source ↗
02 / ACCESS
Prepare a project-specific enquiry.
The official store provides a contact-sales route for G2 and links developer platforms and resources. AGIBOT source ↗
03 / CONFIGURATION
Connect the configuration and task.
Keep G2 and G2 Max separate in specifications and purchasing discussions. AGIBOT introduced the heavy-duty G2 Max at its October 2026 Innovation Day. A useful equipment record should name the chassis, lifting system, hands or grippers, cameras, battery arrangement and installed software. Ask which development interfaces are included for that exact unit and which tasks require additional integration work.
04 / THE T3ND PERSPECTIVE
Plan care and support for your setup.
Start with section 15 of the G2 User Manual and match the instructions to the delivered hardware and software revision. Its maintenance schedule covers weekly, monthly and annual tasks. The manual assigns routine cleaning and inspection to trained operators and mechanical and electrical maintenance to AGIBOT-authorized technicians. Agree who performs each task and how faults reach the service team. The overseas after-sales policy includes G2 sold outside mainland China. For tablet handling, review fixtures, contact surfaces and product changeovers with the integration team. For customer-facing work, plan clear customer routes, accessible parking and charging, and responsibility for spill response.
Which G2 revision, end effectors and software package are proposed for our workstation?
How will object variation, cycle time and interventions be measured during acceptance?
What inspection and cleaning instructions apply to the fitted hands, sensors and mobile base?
Who handles fault recovery, wear parts and service at our installation site?
A USEFUL STARTING POINT
Choose one representative task and agree the observation period before arranging a trial. Record the exact robot configuration, objects, layout, people involved and accepted outcomes. Include routine changeovers and realistic exceptions in the evaluation brief. Use the result to decide the next integration step and the support package the site needs.
News
Published
Six G2 robots complete a 24-hour Shanghai store trial
AGIBOT reports 1,730 tasks across service, restocking, coffee, food and cleaning during a working-store trial on 2–3 November. Four of the six robots passed the final assessment, making task selection and exception handling central to evaluating the result.
Longcheer documents an eight-robot tablet inspection run
Longcheer describes eight Lingxi G2 robots working across the tablet testing segment during a six-day livestream from 23–28 June. The operator reports 64 operating hours and explains how people supervised inspection, coordination and exceptions.
AGIBOT announces G2 integration at Longcheer’s Nanchang tablet production line. The robots load and unload multimedia testing fixtures and sort tested devices within a live factory workflow.
This independent guide connects official publications with practical questions for your project. Follow the sources for current specifications and terms. The care and configuration questions are T3nd’s editorial guidance; obtain the instructions for your supplied hardware and software.