INDEPENDENT MODEL GUIDE

XPENG

XPENG IRON, in context.

XPENG IRON is a humanoid programme moving from public demonstrations and research into production-line manufacturing. Its most useful current milestone is the September 2026 commissioning of XPENG’s robot production lines. The company reports that an IRON unit walked off the line and describes its own stores and campuses as the first settings for commercial rollouts. External market launch and deliveries are planned for 2027.

01 / THE MODEL

The model and its documented work.

XPENG commissioned its robot production lines in September 2026 and planned market launch and deliveries for 2027. XPENG source ↗

The CEO letter records IRON interacting with children at Beijing Auto Museum during Spring Festival 2026. XPENG source ↗

The IronMind paper names IRON-R01 as its real-robot research platform. XPENG Robotics World Model Team source ↗

02 / ACCESS

Prepare a project-specific enquiry.

The September announcement sets out planned first rollouts in XPENG stores and campuses before external deliveries. XPENG source ↗

03 / CONFIGURATION

Connect the configuration and task.

Keep the robot’s generation and research designation visible in every equipment record. The November 2025 Next-Gen IRON presentation and the September 2026 production-line statement describe different joint counts. Research on IRON-R01 adds another specific configuration. Request the technical documentation for the actual delivered unit, including its hands, outer covering, computing platform, battery and available software interfaces.

04 / THE T3ND PERSPECTIVE

Plan care and support for your setup.

Plan the support process alongside the task. Ask for the manufacturer’s current inspection, cleaning, charging, storage and transport instructions for the selected build. A public-facing robot also needs a suitable operating space, a clear supervision arrangement and a consistent process for taking it out of service. Assign responsibility for software changes and preserve the configuration history so that maintenance decisions remain traceable.

05 / BEFORE YOU COMMIT

Questions for the manufacturer or integrator.

  • Which IRON revision and access programme apply to our country and intended use?
  • What task, site preparation and acceptance process would the proposed project cover?
  • Which operator, transport and care instructions accompany the supplied configuration?
  • How would training, replacement parts and regional service be arranged?

A USEFUL STARTING POINT

Prepare a short brief around the people, objects and environment the robot will encounter. Agree measurable outcomes such as completed interactions, successful handling attempts, recovery time and required staff attention. Record the generation and software version throughout the evaluation. A well-defined first application gives the manufacturer and the operator a shared basis for choosing training, site preparation and the next deployment milestone.

News

  1. Published

    IronMind publishes manipulation results on IRON-R01

    XPENG Robotics publishes research on learning dexterous manipulation from human video and robot experience. The experiments identify IRON-R01 and test transfer to unfamiliar objects and instructions.

    XPENG Robotics World Model Team source ↗
  2. Published

    XPACE explores prediction and recovery on IRON

    XPENG researchers publish a world-and-action model tested on IRON. The work examines learning from mixed experience and using simulated recovery examples to improve real-robot task completion.

    XPENG Robotics research authors source ↗
  3. Published

    IRON walks off XPENG’s new production line

    XPENG commissions its robot production lines and reports an IRON unit walking off the line. Initial rollouts are planned for its own stores and campuses, with market launch and deliveries in China and overseas planned for 2027.

    XPENG source ↗
  4. Published

    XPENG documents IRON interacting with museum visitors

    XPENG’s CEO letter records IRON working at the Beijing Auto Museum during the 2026 Spring Festival and interacting with children. It provides a named public venue for the model family’s visitor-facing use.

    XPENG source ↗
  5. Published

    Next-Gen IRON introduces a new body and hand design

    XPENG unveils the next generation of IRON at its Guangzhou AI Day. The presentation establishes the new body architecture and development direction for commercial-facing applications.

    XPENG source ↗

Manufacturer and programme sources.

  1. IRON rolls off new production lineXPENG · Official publication
  2. Next-Gen IRON unveiled at AI DayXPENG · Official publication
  3. 2025 ESG report CEO letterXPENG · Official publication
  4. XPACE joint world and action modellingXPENG Robotics research authors · Official publication
  5. IronMind dexterous manipulation researchXPENG Robotics World Model Team · Official publication

This independent guide connects official publications with practical questions for your project. Follow the sources for current specifications and terms. The care and configuration questions are T3nd’s editorial guidance; obtain the instructions for your supplied hardware and software.

START WITH YOUR MODEL

A care question?
A missing accessory?

Tell us what you need for XPENG IRON. We’ll review your robot details and get back to you by email.

Ask about XPENG IRON